Summer Solar



Participants:
Azusa (17.5%), Pasadena (32.5%), Riverside (50%)

About Summer Solar
The Summer Solar Project is a 20 MW solar facility located in Lancaster, California. The facility achieved commercial operation in July 2016.

Fiscal Year 2021-2022
This fiscal year Summer Solar delivered 56,883 MWhs, realizing a 32% annual net capacity factor.